What Is Sitting Between Your Home and the Ground?
If the skirting is cracked, missing, or never installed, you have a problem you may not see yet. The wind blows cold air under your floor every winter. Rodents find an easy path into your crawl space. Monsoon rain splashes into the underside and soaks your insulation. Over time, your pipes, belly board, and insulation all take damage from the exposure.
Our Mobile Home Skirting Services
Vinyl Skirting Panel Installation
Crawl Space Ventilation Panel Setup
Rodent Barrier Mesh Installation
Insulated Skirting for Freeze Protection
Storm-Damaged Skirting Repair and Panel Replacement
What Homeowners in Prescott Valley Say Separates Us from the Rest
We match the material to your home and site conditions.
A park model at Desert Pines Resort has different needs than a double-wide on acreage at Coyote Springs. We look at your home, your soil, your slope, and the park's rules before we recommend anything. That is how we pick the right product for the right job.
We set a level ground track before the first panel goes in.
Most skirting failures start at the bottom. If the ground track is not level, the panels bow, gaps form, and the whole installation comes apart. We set the track with a laser and verify it before we move on.
We install proper ventilation from the start.
HUD requires a specific amount of open crawl space ventilation per square foot of floor area. We calculate the right number of vent panels for your home before we build. This keeps moisture from building up in the crawl space and protects your insulation and joists.
We add a rodent barrier mesh at no extra charge.
Open vents let in air. But they also let in mice and pack rats. We back every ventilation opening with a fine-gauge galvanized mesh that blocks rodents while keeping airflow moving. This is standard on every job we do.
We are familiar with every park's skirting rules.
Shadow Mountain, Desert Pines Resort, and other Prescott Valley communities each have their own list of approved skirting materials, colors, and height requirements. We check those rules before we start so your installation passes the first park inspection.
We clean up every job site the same day.
Old skirting panels, broken trim pieces, and packaging materials leave your home looking worse before it looks better. We haul everything out before we leave. You come home to a clean perimeter, not a pile of debris.
How We Install Skirting From Start to Finish
Morning Measure and Material Order
We walk the full perimeter and measure every side of the home. We note the soil conditions, any slopes, and the existing vent and access door locations. We then calculate the exact panel count, track footage, and ventilation panel count before we order materials.
Site Prep
We clear any debris from the perimeter. If the soil is uneven, we grade a flat bed for the ground track. We also remove any existing damaged skirting, old track, and rusted hardware.
Installation Day
We set the ground track first. Next, we run the top J-channel along the home's bottom rail. Then we measure, cut, and slide each panel into place. Vents and access doors go in as we work around the perimeter. Finally, we back every vent with rodent mesh and caulk the base of the track against the soil.
Final Inspection
We walk the perimeter with you and check every panel for gaps, proper snap-lock engagement, and clean corner miters. We also open and close the access door to confirm it operates smoothly. We do not leave until you are satisfied.